From Blueprints to CO: A Simple Guide to Building a Home

  • Writer: Yasmin Monzon
    Yasmin Monzon
  • Aug 18
  • 2 min read

Updated: Oct 1



Ever wondered what it really takes to build a home from the ground up? From planning to the final inspection, every phase of construction comes with checkpoints to make sure the project is safe, compliant, and built to last. Here’s a clear breakdown.



Phase 1: Pre-Construction – Planning & Permits


This is where ideas meet regulations.


Work Done:


  • Define the project scope, budget, and timeline.

  • Hire an architect or engineer to prepare detailed plans.

  • Submit plans for city approval.

  • Secure bonds, insurance, and arrange utility connections.


Inspections:


  • Plan review approval

  • Zoning compliance check

  • Environmental review (if required)


This stage is like setting the rules of the game—without permits and approvals, nothing moves forward.



Phase 2: Site Prep & Foundation – The Groundwork


The lot becomes a construction site.


Work Done:


  • Clear trees, grade the land, and set up temporary utilities.

  • Excavate for footings and foundations.

  • Pour concrete slabs, basements, or reinforced footings.


Inspections:


  • Soil and compaction test

  • Footing reinforcement check

  • Concrete pour approval


A strong foundation is literally the base of the entire home—it determines durability for decades to come.



Phase 3: Structure – Building the Skeleton


The home begins to take shape.


Work Done:


  • Frame walls, floors, and roof.

  • Install sheathing, bracing, and exterior walls.

  • Add roofing, windows, and doors.


Inspections:


  • Framing and roof sheathing

  • Windstorm bracing (in certain zones)

  • Window/door installation

  • Roofing and waterproofing


This is the stage where the house finally “looks real.”



Phase 4: MEP Systems – The Hidden Lifelines


Often called the MEP phase (Mechanical, Electrical, Plumbing).


Work Done:


  • Install plumbing, gas lines, and ductwork.

  • Wire electrical circuits, panels, and outlets.

  • Set HVAC units, vents, and test gas pressure.

  • Add insulation and close with drywall.


Inspections:


  • Plumbing (underground & rough-in)

  • Electrical rough-in

  • HVAC ductwork and gas pressure

  • Insulation and fireproofing


These are the arteries and nerves of the home—mostly invisible later, but essential forever.



Phase 5: Interior & Exterior Finishes


The design vision comes alive.


Work Done:


  • Drywall, flooring, cabinetry, trim, and paint.

  • Install lighting, sinks, toilets, and appliances.

  • Exterior siding, stucco, or brick.

  • Driveways, patios, walkways, and landscaping.


Inspections:


  • Final electrical (fixtures and covers)

  • Final plumbing (toilets, sinks, showers)


At this stage, the house transforms into a home, complete with personality and curb appeal.



Phase 6: Final Inspections & Occupancy


The last hurdle before moving in.


Work Done:


  • Final walkthrough of all systems and safety features.

  • Ensure code compliance and site cleanliness.

  • Submit documentation for approvals.


Inspections:


  • Final building and safety inspection

  • Fire department approval (alarms, sprinklers, exits)

  • ADA compliance (if required)

  • Energy efficiency or green certification (if applicable)


Completion:

Once everything passes, the city issues the Certificate of Occupancy (CO)—the official green light to move in.



Pro Tip: Keep the Site Compliant


  • Temporary fencing is often required for safety and liability.

  • Clean, organized sites prevent fines and delays.

  • Inspectors may arrive unannounced—site conditions matter as much as paperwork.



Final Thoughts


From blueprints to CO, building a home is a journey of coordination, approvals, and craftsmanship. Each phase—planning, foundation, framing, systems, finishes, and inspections—plays a critical role in transforming drawings into a safe, livable space.


So the next time you see a house under construction, remember: behind those walls is a carefully staged process, months of planning, and a little piece of paper—the CO—that makes it officially “home.”